Windstream 3
June 2026
This was a twin bathroom renovation.
We deleted the tub in the first bath and installed a fully tiled shower with sliding glass doors.
Below is the "before" picture for bath 1.
At bath 2 (below) we protected the original tub and tiled around it.
Below is the "before" for bath 2.
A view of the new vanity area.