Chris@CPRConstructionNC.com
919-729-7471
About Us
Our Services
Projects
Projects
All Projects
Attics
Basements
Bathrooms
Kitchens
Additions
Small Projects
Testimonials
Contact us
Windstream 2
June 2022
This was a full master bath renovation. We also replaced all 2nd floor doors, hardware and added wainscoting trim in 2 other bedrooms, full paint.
Here is the bathroom before we began work.
An alternate view of the "before" status.
Here is the same view. We replaced the angled corner closet (with mirrored door) with a squared off wall and deeper shelves inside it.
The new shower has 2 side by side double niches. Wall tile reaches all the way up to the sloped ceiling on 2 walls.
An example of new wall trim in 2 bedrooms. The new entrance doors were ordered to match the trim.
Related Projects
Spindle Creek
Another master bathroom complete renovation. Locations of items did not change but there was a tub deletion and we added a sit down dressing area next to the window to repurpose the old tub space.
June 2026
Windstream 3
This was a twin bathroom renovation.
April 2026
Brownfield
Reconfiguration of entire master bathroom.
March 2026