Alden Bridge - Attic
April 2021
This attic and bathroom project finished off at 1,200 sf.
We foam insulated to encapsulate the entire attic heat envelope then finished if all off with main space, full bath, office space and lots of storage.
The bathroom was for "utility" but we really made it looks sweet with some key selections...
A view standing in front of the big triple window looking back toward the stairs. There's a half-glass office door just to the right side.
Related Projects
Spindle Creek
Another master bathroom complete renovation. Locations of items did not change but there was a tub deletion and we added a sit down dressing area next to the window to repurpose the old tub space.
June 2026
Windstream 3
This was a twin bathroom renovation.
April 2026
Brownfield
Reconfiguration of entire master bathroom.
March 2026