Chris@CPRConstructionNC.com
919-729-7471
About Us
Our Services
Projects
Projects
All Projects
Attics
Basements
Bathrooms
Kitchens
Additions
Small Projects
Testimonials
Contact us
Windstream 2
June 2022
This was a full master bath renovation. We also replaced all 2nd floor doors, hardware and added wainscoting trim in 2 other bedrooms, full paint.
Here is the bathroom before we began work.
An alternate view of the "before" status.
Here is the same view. We replaced the angled corner closet (with mirrored door) with a squared off wall and deeper shelves inside it.
The new shower has 2 side by side double niches. Wall tile reaches all the way up to the sloped ceiling on 2 walls.
An example of new wall trim in 2 bedrooms. The new entrance doors were ordered to match the trim.
Related Projects
Thistle Briar
We finished off the 2nd half of this basement add a full bathroom and separate wet bar area.
January 2024
Piperwood
Renovate both master bath and part of hall bath.
July 2023
King George Loop2
This was a kitchen, double bath and laundry room renovation.
June 2023