A small up arrow.

Spring Hollow 1

November 2022
This home had a major up fit: new roof, exterior doors, windows and siding, deck resurfacing w/new railings, fireplaces, floorings, interior doors and trims, full master bath, full kitchen, complete basement renovation, new lower HVAC system. The works.
We'll give a few pictures of highlights of the project. The kitchen was redesigned to remove the wall to dining room and delete the walled pantry (left side of next photo).
We'll give a few pictures of highlights of the project. The kitchen was redesigned to remove the wall to dining room and delete the walled pantry (left side of next photo).
Old pantry came out and previously poorly installed air ducting and plumbing were replaced. All the laminate flooring, which was laying on top of oak hardwoods, were removed.
Old pantry came out and previously poorly installed air ducting and plumbing were replaced. All the laminate flooring, which was laying on top of oak hardwoods, were removed.
The new kitchen.
The new kitchen.
View showing bartop working counter where the old wall used to be.
View showing bartop working counter where the old wall used to be.
All stairs replaced and refinished.
All stairs replaced and refinished.
2 flights of stairs replaced and carpeting throughout home replaced to new hardwoods.
2 flights of stairs replaced and carpeting throughout home replaced to new hardwoods.
In the master suite we addd a wide closet behind the bathroom wall.
In the master suite we addd a wide closet behind the bathroom wall.
The master bathroom - storage to the right, double vanity, shower, and new windows relocated to fit between vanity and shower.
The master bathroom - storage to the right, double vanity, shower, and new windows relocated to fit between vanity and shower.
Below, the door on left leads to private water closet.
Below, the door on left leads to private water closet.

Related Projects