A small up arrow.

Loch Cove

June 2022
Full master bathroom renovation with new window and relocation of shower and toilet area.
Below is an "after" image - both window and tub were shifted to the left and larger shower moved to the right.
Below is an "after" image - both window and tub were shifted to the left and larger shower moved to the right.
Here is the after photo. Notice the original partition wall separating the shower from the toilet, which was hidden behind the shower.
Here is the after photo. Notice the original partition wall separating the shower from the toilet, which was hidden behind the shower.
An alternate new to show all new crown molding to match original, open layout with knee wall to give some privacy while at toilet. The knee wall is capped with the same stone as counter top.
An alternate new to show all new crown molding to match original, open layout with knee wall to give some privacy while at toilet. The knee wall is capped with the same stone as counter top.

Related Projects