Jackson Dane

April 2021
This 840 sf basement needed it's layout opened up, which required us to remove the central bearing wall.
The feature photo here is the concrete removal. Many clients ask how is this done. The picture shows how we remove, dig down and install more concrete to take the additional load at the end of the steel beam.
The feature photo here is the concrete removal. Many clients ask how is this done. The picture shows how we remove, dig down and install more concrete to take the additional load at the end of the steel beam.
Same view with beam installed and old wall removed...
Same view with beam installed and old wall removed...
The finished result from a different angle...
The finished result from a different angle...
The open railing...
The open railing...
Opposite end of the beam and the mini wet bar...
Opposite end of the beam and the mini wet bar...
Modest bathroom...
Modest bathroom...